Field
Name |
Description |
Project
Report Information |
|
Project Name |
Unique project name |
|
|
Project Name (Alias 1) |
Other name project is
listed under |
|
|
Project Name (Alias 2) |
Other name project is
listed under |
|
|
Public Law Number |
Number of Public Law authorizing project
(99-662) |
|
|
Section Number |
Section number of Public Law authorizing
project (1135) |
|
|
Project Phase |
Completed, Construction, PED (Plans &
Specs), or Feasibility |
|
|
Corps Division |
Three-letter abbreviation |
|
|
Corps District |
Name of District |
|
|
Project Manager |
Name of project manager at the District |
|
|
State (1) |
Two-letter postal abbreviation for
state(s) where the project is located |
|
|
State (2) |
|
|
|
State (3) |
|
|
|
State (4) |
|
|
|
Congressional District (1) |
Two-letter state abbreviation plus number of congressional district(s) |
|
|
Congressional District (2) |
|
|
|
Congressional District (3) |
|
|
|
Congressional District (4) |
|
|
|
Congressional District (5) |
|
|
|
Congressional District (6) |
|
|
|
Congressional District (7) |
|
|
|
Congressional District (8) |
|
|
|
Parent Project |
Name of Corps project associated with the
conditions this project will address, if any. If none, then enter none. |
|
|
Parent Project Name
(Alias 1) |
Other name parent
project is listed under |
|
|
Parent Project Name
(Alias 2) |
Other name parent
project is listed under |
|
|
Parent Project Purpose |
Purpose for which parent project was
authorized (Navigation, Flood Control, etc.) |
|
|
USGS Map |
USGS topographic map(s) sheet name(s) for
the project |
|
|
Hydrologic Unit Code |
Eight-digit code for project watershed |
|
|
Watershed |
Watershed name |
|
|
Latitude |
Latitude, in degrees, of project center |
|
|
Longitude |
Longitude, in degrees, of project center |
|
|
Project Report Name |
Project Report Name |
|
|
Project Report Date |
Date of Project Report |
|
|
Reconnaissance/ Preliminary Restoration
Plan (PRP)/ Initial Appraisal (IA) Completed |
Date document completed |
|
|
Project Modification Report (PMR)
Completed |
Date document completed |
|
|
Feasibility Cost Sharing Agreement (FCSA)
executed |
Date FCSA signed |
|
|
Feasibility Phase Initiated |
Date study is initiated |
|
|
Feasibility Study/ Ecosystem
Restoration Report (ERR)/Project Modification Report (PMR) Completed |
Date of feasibility/PMR Report Document
completed |
|
|
Feasibility Project Cost
Estimate |
Estimate of Total
Project Cost presented in the Feasibility Report |
|
|
Feasibility Phase Completed |
Date study is completed |
|
|
Project Cooperation Agreement (PCA) Signed |
Date PCA is signed |
|
|
Project Construction Funds Obligated |
CWAP accounting for wetlands requires date
funds are secured |
|
|
Project Construction Initiated |
Date construction began (Calendar Year) |
|
|
Project Construction Completion |
Date construction completed (Calendar
Year) |
|
|
Successful Bid |
Amount of successful bid
awarded for project as shown in Plans & Specifications |
|
|
Total Project Cost |
Total Project Cost (in dollars) |
|
|
Corp Costs |
Corps portion of the Total Project Cost
(in dollars) |
|
|
Cost Sharing Sponsor |
Name of cost sharing sponsor (signing the
PCA) |
|
|
Sponsor Type |
Tribal, State or local (agency),
Non-government organization |
|
|
Supporting Agency (1) |
Agencies that support the project (as
indicated in fact sheets) |
|
|
Agency Type (1) |
Federal, Tribal, State or local (agency),
Non-government organization |
|
|
Supporting Agency (2) |
Agencies that support the project (as
indicated in fact sheets) |
|
|
Agency Type (2) |
Federal, Tribal, State or local (agency),
Non-government organization |
|
|
Supporting Agency (3) |
Agencies that support the project (as
indicated in fact sheets) |
|
|
Agency Type (3) |
Federal, Tribal, State or local (agency),
Non-government organization |
|
|
Supporting Agency (4) |
Agencies that support the project (as
indicated in fact sheets) |
|
|
Agency Type (4) |
Federal, Tribal, State or local (agency),
Non-government organization |
|
|
Supporting Agency (5) |
Agencies that support the project (as
indicated in fact sheets) |
|
|
Agency Type (5) |
Federal, Tribal, State or local (agency),
Non-government organization |
|
|
Supporting Agency (6) |
Agencies that support the project (as
indicated in fact sheets) |
|
|
Agency Type (6) |
Federal, Tribal, State or local (agency),
Non-government organization |
|
|
Supporting Agency (7) |
Agencies that support the project (as
indicated in fact sheets) |
|
|
Agency Type (7) |
Federal, Tribal, State or local (agency),
Non-government organization |
|
|
Supporting Agency (8) |
Agencies that support the project (as
indicated in fact sheets) |
|
|
Agency Type (8) |
Federal, Tribal, State or local (agency),
Non-government organization |
|
|
Supporting Agency (9) |
Agencies that support the project (as
indicated in fact sheets) |
|
|
Agency Type (9) |
Federal, Tribal, State or local (agency),
Non-government organization |
|
|
Supporting Agency (10) |
Agencies that support the project (as
indicated in fact sheets) |
|
|
Agency Type (10) |
Federal, Tribal, State or local (agency),
Non-government organization |
|
|
Resource Issue(s) |
Describe the problem(s) this project will
address (e.g. decreasing fish/waterfowl population) |
|
|
Planned Resource Output: Riparian - acres |
These fields hold quantitative data for
the physical outputs each project is designed to
provide. Projects may involve multiple physical attributes; each field
holds quantitative data on a specific physical output. |
|
|
Planned Resource Output: Open Water -
acres |
|
|
|
Planned Resource Output: Aquatic
(instream) - acres |
|
|
|
Planned Resource Output: Moist Soil
Management Units - acres |
|
|
|
Planned Resource Output: Forest - acres |
|
|
|
Planned Resource Output: Terrestrial -
acres |
|
|
|
Planned Resource Output: Stream/ River -
miles |
|
|
|
Planned Resource Output: Oxbow/ Chute -
miles |
|
|
|
Planned Resource Output: Backwater/Slough
- acres |
|
|
|
Planned Resource Output: Prairie - acres |
|
|
|
Planned Resource Output: Aquatic
Vegetation - acres |
|
|
|
Planned Resource Output: SAV- acres |
|
|
|
Planned Resource Output: Fisheries -
number |
|
|
|
Planned Resource Output:
Islands - number |
|
|
|
Planned Resource Output:
Shoreline - miles |
|
|
|
Planned Resource Output: Wetlands - acres |
|
|
|
CWAP Wetland Establishment |
Acres of wetlands established, defined as the
manipulation of the physical, chemical, or biological characteristics present
to develop a wetland that did not previously exist on an upland or deepwater
site.
Establishment results in a gain in wetland acres. |
|
|
CWAP Wetland Restoration/Re-establishment |
Acres of wetlands re-established, defined as the manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural/historic functions to former wetlands. Re-establishment results in rebuilding a former wetland and results in a gain in wetland acres. |
|
|
CWAP Wetland Restoration/ Rehabilitation |
Acres of wetlands rehabilitated, defined as the manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural/historic functions of a degraded wetland. Rehabilitation results in a net gain in wetland function (not tracked at this point) but does not result in a gain in wetland acres. |
|
|
CWAP Wetland Enhancement |
Acres of wetlands enhanced, defined as the manipulation of the physical, chemical, or biological characteristics of a wetland (undisturbed or degraded) site to heighten, intensify, or improve specific function(s) or to change the growth stage or composition of the vegetation present. Enhancement is undertaken for a purpose such as water quality improvement, flood water retention, or wildlife habitat. Enhancement results in a change in wetland function(s) and can lead to a decline in other wetland function(s), but does not result in a gain in wetland acres. |
|
|
CWAP Wetland Protection |
Acres of wetlands protected, defined as the removal of a threat to, or preventing decline of, wetland conditions by an action in or near a wetland. Includes purchase of land or easements, repairing water control structures or fences, or structural protection such as repairing a barrier island. This term also includes activities commonly associated with the term "preservation". Protection/Maintenance does not result in a gain of wetland acres or function. |
|
|
Estimated Cost of Resource Output:
Riparian - acres |
These fields hold estimated construction
cost data, computed in the feasibility study, for the physical outputs each project is designed to provide.
Projects may involve multiple physical
attributes; each field holds quantitative data on a specific physical output. |
|
|
Estimated Cost of Resource Output: Open
Water - acres |
|
|
|
Estimated Cost of Resource Output: Aquatic
(instream) - acres |
|
|
|
Estimated Cost of Resource Output: Moist
Soil Management Units - acres |
|
|
|
Estimated Cost of Resource Output: Forest
- acres |
|
|
|
Estimated Cost of Resource Output:
Terrestrial - acres |
|
|
|
Estimated Cost of Resource Output: Stream/
River - miles |
|
|
|
Estimated Cost of Resource Output: Oxbow/
Chute - miles |
|
|
|
Estimated Cost of Resource Output:
Backwater/Slough - acres |
|
|
|
Estimated Cost of Resource Output: Prairie
- acres |
|
|
|
Estimated Cost of Resource Output: Aquatic
Vegetation - acres |
|
|
|
Estimated Cost of Resource Output: SAV-
acres |
|
|
|
Estimated Cost of Resource Output:
Fisheries - number |
|
|
|
Estimated Cost of
Resource Output: Islands - number |
|
|
|
Estimated Cost of
Resource Output: Shoreline - miles |
|
|
|
Estimated Cost of Resource Output:
Wetlands - acres |
|
|
|
Design Measure |
Design or approach/measure used to accomplish project
outputs and outcomes (e.g. water control management). |
|
|
Project Performance Monitoring Index
(Planned) |
Desired units of monitoring performance index (e.g. Number of HU’s perferred plan is
expected to produce) |
|
|
Project Outcomes |
Overall Desired results or goals of project (e.g.
increased Least Tern population), from project outputs (e.g. 1000 acres
aquatic instream (nesting) habitat) |
|
|
Coastal America Project |
Yes/No - Is this a Designated Coastal
America Project |
|
|
Coastal America National Partnership Award |
Yes/No - Has project received a Coastal
America National Partnership Award |
|
|
Benefit North American Waterfowl
Management Plan |
Yes/No - Does project benefit NAWMP |
|
|
National Estuary Program (NEP) |
Yes/No – Does project contribute to the
NEP |
|
|
Benefit Endangered Species |
Yes/No - Do the project purposes
include any benefit to any endangered species? In general, any project could have a bald
eagle or other endangered specie fly over during the life of the
project. We are looking for projects
designed to benefit endangered species. |
|
|
Endangered Specie (1) |
Each endangered species must be listed
separately. |
|
|
Endangered Specie (2) |
|
|
|
Endangered Specie (3) |
|
|
|
Endangered Specie (4) |
|
|
|
Endangered Specie (5) |
|
|
|
Endangered Specie (6) |
|
|
|
Endangered Specie (7) |
|
|
|
Endangered Specie (8) |
|
|
|
Endangered Specie (9) |
|
|
|
Endangered Specie (10) |
|
|
|
Endangered Specie (11) |
|
|
|
Endangered Specie (12) |
|
|
|
Endangered Specie (13) |
|
|
|
Endangered Specie (14) |
|
|
|
Endangered Specie (15) |
|
|
|
Recreation Use |
Yes/No - Are there recreational
opportunities at the project |
|
|
Monitoring Plan |
Yes/No - Yes if the feasibility study identifies
a monitoring cost in the project cost estimate. |
|
|
Description of Monitoring Plan |
Description of the monitoring plan
(schedule, cost, scope of work) |
|
|
Monitor Name |
Who is the monitor (agency/NGO) |
|
|
Project Performance Monitoring Index
(Actual) |
Units of performance index after
monitoring |
|
|
Actual Resource Output: Riparian - acres |
These fields hold quantitative data for
the physical outputs each project that is monitored
actually provides. Projects may involve multiple physical attributes; each field
holds quantitative data on a specific physical output. |
|
|
Actual Resource Output: Open Water - acres |
|
|
|
Actual Resource Output: Aquatic (instream)
- acres |
|
|
|
Actual Resource Output: Moist Soil
Management Units - acres |
|
|
|
Actual Resource Output: Forest - acres |
|
|
|
Actual Resource Output: Terrestrial -
acres |
|
|
|
Actual Resource Output: Stream/ River -
miles |
|
|
|
Actual Resource Output: Oxbow/ Chute -
miles |
|
|
|
Actual Resource Output: Backwater/ Slough
- acres |
|
|
|
Actual Resource Output: Prairie - acres |
|
|
|
Actual Resource Output: Aquatic Vegetation
- acres |
|
|
|
Actual Resource Output: SAV- acres |
|
|
|
Actual Resource Output: Fisheries - number |
|
|
|
Actual Resource Output:
Islands - number |
|
|
|
Actual Resource Output:
Shoreline - miles |
|
|
|
Actual Resource Output: Wetlands - acres |
|
|
|
Related Studies |
Other studies with pertinent information
(River Basin Study, EIS, etc.) |
|
|
Pictures |
Are there photos of the project (filename) |
|
|
Maps |
Maps depicting project location |
|
|
Design Plans |
Design Plans available for project |
|
|
Incremental Analysis |
Is there a graph/table of the analysis to
display for this project (filename) |
|
|
Recommended incremental
quantity |
The volume of the last
increment of output recommended |
|
|
Cost for recommended
increment |
Cost for the last
increment |
|
|
First rejected
incremental quantity |
Volume of the next
increment of output (rejected) |
|
|
Cost for First rejected
increment |
Cost of the next
increment (rejected) |
|
|
Rationale |
District's explanation for the acceptance of the selected
incremental cost |
|
|
Analyst's comments |
IWR reviewers
comments on any part of the report or project |
|